Suriname Road Survey, Suriname
DTM / Engineering Surveying / Geodetic Control / GNSS / South America / SurinameCLIENT: Roughton International
DATE: 2008
Undertook a 140 kilometre strip survey starting in Paramaribo and finishing at the French Guiana Border. Geodetic control was placed every 1 mile in concrete, with a 40 metre wide strip survey.
[MS418]
Share